
Development History
Home > Development History
2000
Set up Fiber Optic Patchcord and Pigtail Production Lines.
2005
Set up Adapter, Connector and Attenuator Production Lines.
2008
Set up Fiber Optic Cable Production Lines.
2010
Set up Media Converter, Ethernet Switch, and POE Switch Production Lines.
2012
Set up WDM/CWDM/DWDM Workshop.
2014
Set up PLC Splitter and Terminal Box Production Lines.
2017
Set up MPO/MTP cable Assemblies Workshop.
2019
Set up PM and High Power Components Workshop.